# Line Painting Prices Toronto | Line Painting Toronto

> Toronto line painting prices: stalls $12-$18, fire routes $4-$8/ft, thermoplastic $8-$18/ft, courts, EV and garages. Written quote before any work.

URL: https://linepaintingtoronto.ca/pricing/

# Line Painting Prices in Toronto

Published price ranges for every common job. Your site gets a written per-stall or per-linear-foot quote before any work starts, and the price on the quote is the price on the invoice.

-   20+ Years Combined
-   $2M Liability + WSIB
-   Graco LineLazer + Thermoplastic
-   OTM Book 11 Compliant
-   COI in 24 Hours

Price List

## Toronto Line Painting Price Ranges

| Item | Price range | Service |
| --- | --- | --- |
| Standard stall | $12-$18 | Details |
| Double stall (van accessible) | $20-$30 | Details |
| Handicap (AODA) stall | $150-$300 | Details |
| Fire route | $4-$8/ft | Details |
| Thermoplastic | $8-$18/ft | Details |
| Preformed tape | $12-$25/ft | Details |
| Warehouse marking | $3-$7/ft | Details |
| Forklift lanes (thermoplastic) | $8-$15/ft | Details |
| Curb painting | $2-$5/ft | Details |
| EV station (single) | $800-$1,500 | Details |
| Multi-station condo EV | $5K-$30K | Details |
| Pickleball court | $3,500-$5,000 | Details |
| Basketball court | $2,500-$6,000 | Details |
| Tennis court | $3,000-$7,500 | Details |
| Shopping plaza (100 stalls) | $1,500-$3,000 | Details |
| Underground garage (200 stalls) | $4K-$9K | Details |
| Annual property manager contract (10 sites) | $25K-$75K/yr | Details |

Quoted per job in writing: 

Custom Pavement Logos

[/custom-pavement-logo-toronto/ →](/custom-pavement-logo-toronto/)

, 

Playground Markings

[/playground-game-marking-toronto/ →](/playground-game-marking-toronto/)

, 

Stencil Painting

[/stencil-painting-toronto/ →](/stencil-painting-toronto/)

.

Timelines

## How Long Does It Take?

| Job | Typical time |
| --- | --- |
| 30-stall lot | 2-4 hrs |
| 100-stall plaza | 1 day |
| 200-stall garage | 2 days |
| Warehouse 10K sq ft thermoplastic | 2-3 days |
| Pickleball court | 4-6 hrs |

## Pricing Notes

-   Written per-stall or per-linear-foot quote before any work.
-   Layout changes, surface prep, arrows, stencils and access affect the final quote, and each is itemized.
-   Overnight 10pm-6am and weekend windows at no surprise surcharge; any scheduling premium is on the quote.
-   Prices in Canadian dollars, plus HST.
-   COI with $2M liability and WSIB within one business day.

Cost Per Year, Not Per Coat

## Paint vs Thermoplastic vs Preformed Tape

Thermoplastic costs more per foot but lasts about three times longer than paint in high-wear zones. Here is how the three compare.

| Material | Typical life | Cure / reopen | Best application | Price range |
| --- | --- | --- | --- | --- |
| Waterborne traffic paint | 12-24 months | 30-60 min fast-dry | Standard stalls, low to medium traffic lots, garages | $12-$18 per stall |
| Hot-applied thermoplastic | 3-5 years | Minutes | Fire routes, forklift lanes, plaza entrances, stop bars | $8-$18 per linear ft |
| Preformed cold-applied tape | 5-7 years | Open on install | Crosswalks, intersections, very high volume zones | $12-$25 per linear ft |

Example: 1,000 linear feet of high-wear fire route at $6/ft in paint, repainted every 12 months, is about $30,000 over five years. The same route in thermoplastic at $13/ft, applied twice in five years, is about $26,000 with three fewer closures. On quieter zones where paint lasts 24 months, paint usually stays the cheaper choice, and we will tell you so. 

See thermoplastic details

[/thermoplastic-line-marking-toronto/ →](/thermoplastic-line-marking-toronto/)

.

Pricing Questions

## Line Painting Cost FAQs

### How much does line painting cost in Toronto?

Standard parking stall $12-$18 per stall. Double stall (van accessible) $20-$30. Fire route per linear foot $4-$8. Hot-applied thermoplastic $8-$18 per linear foot. Pickleball court $3,500-$5,000 full regulation layout. Warehouse floor marking per linear foot $3-$7. Written per-stall or per-linear-foot quote before any work.

### What do EV charging station markings include?

A full EV package includes the stall outline or green fill, the EV plug-and-car stencil, directional arrows and accessibility signage. Single stations cost $800-$1,500 and multi-station condo projects $5K-$30K.

### How much does warehouse floor marking cost?

Warehouse floor marking costs $3-$7 per linear foot in paint and $8-$15 per linear foot for thermoplastic forklift lanes. We phase the work zone by zone around your shifts so the floor never fully shuts down.

### How much does fire route marking cost and how long does it last?

Fire route marking costs $4-$8 per linear foot in paint, which lasts 12-24 months, or $8-$18 per linear foot in thermoplastic, which lasts 3-5 years. Both include curb coating and FIRE ROUTE stencils.

### How do your written quotes work?

We measure stall counts and linear feet, confirm the material per zone and the work window, then send a written per-stall or per-linear-foot quote before any work starts. The price on the quote is the price on the invoice.

Request a Free Written Quote

[/contact/ →](/contact/)

![Line painting crew restriping a Toronto plaza parking lot overnight with Graco LineLazer rigs](/images/misc/line-painting-crew-in-yellow-work-shirts-restripin-2.webp)

24/7 Phone Answered

## Get Your Written Per-Stall Quote

Send the site address, stall count or linear feet and your work window. A written price comes back within one business day, and your COI follows the next morning.

Request a Free Written Quote

[/contact/ →](/contact/)

 

Call (647) 577-6511

[tel:+16475776511 →](tel:+16475776511)

-   Written quote before any work
-   $2M liability + WSIB
-   Overnight 10pm-6am crews
