# Toronto Line Painting Projects | Line Painting Toronto

> Toronto line painting case studies: Yorkville plaza overnight, Scarborough warehouse thermoplastic, Rosedale pickleball court.

URL: https://linepaintingtoronto.ca/projects/

# Toronto Line Painting Projects

Ten recent jobs across the GTA, from a Yorkville plaza restriped overnight to thermoplastic forklift lanes in Scarborough and a regulation pickleball court in Rosedale. Each card shows the budget, material and timeline, and links to the matching service and city page. Locations are given by neighbourhood or intersection only.

-   20+ Years Combined
-   $2M Liability + WSIB
-   Graco LineLazer + Thermoplastic
-   OTM Book 11 Compliant
-   COI in 24 Hours

![Yorkville shopping plaza after an overnight line painting restripe](/images/misc/yorkville-shopping-plaza-parking-lot-at-dawn-after.webp)

Yorkville $4,200

## Yorkville shopping plaza overnight restripe

Challenge

A busy multi-tenant plaza that had lost a Saturday to restriping every year for five years.

What we did

Full restripe overnight with Graco LineLazer 3900 rigs, fire route curbs, accessible stalls and reserved stencils, phased so early-opening tenants were done first.

Result

Every stall crisp by 7am opening and zero tenant complaints.

-   Material: Fast-dry waterborne paint, glass beads
-   Timeline: One overnight shift, 10pm-6am

Shopping Plaza Painting

[/shopping-plaza-line-painting-toronto/ →](/shopping-plaza-line-painting-toronto/)

 

Toronto Central

[/service-areas/toronto-central/ →](/service-areas/toronto-central/)

![Yonge and Eglinton underground garage after restriping](/images/misc/yonge-and-eglinton-underground-parking-garage-leve.webp)

Yonge and Eglinton $6,850

## Yonge and Eglinton underground garage

Challenge

200 stalls across two underground levels with faded stalls, unmarked columns and people walking down the ramp.

What we did

Moisture testing and primer on damp sections, restriped stalls, yellow and black column chevrons, clearance markings and a pedestrian path to the elevator lobby.

Result

Two levels finished over a weekend and ramp foot traffic stopped.

-   Material: Low-VOC traffic coating, moisture-tolerant primer
-   Timeline: Two days over one weekend

Parking Garage Painting

[/parking-garage-line-painting-toronto/ →](/parking-garage-line-painting-toronto/)

 

Toronto Central

[/service-areas/toronto-central/ →](/service-areas/toronto-central/)

![Scarborough warehouse with thermoplastic forklift lanes and walkways](/images/misc/scarborough-warehouse-floor-with-bright-yellow-the.webp)

Scarborough $18,500

## Scarborough warehouse thermoplastic forklift lanes

Challenge

Painted forklift lanes ground away at every intersection, with a WSIB inspection coming up.

What we did

Thermoplastic forklift lanes and pedestrian walkways laid out to the fleet, with stop bars and crossings at every aisle intersection.

Result

Still sharp three years later, and the WSIB inspection passed on the first visit.

-   Material: Hot-applied thermoplastic
-   Timeline: Phased over several nights

Warehouse Line Painting

[/warehouse-line-painting-toronto/ →](/warehouse-line-painting-toronto/)

 

Scarborough

[/service-areas/scarborough/ →](/service-areas/scarborough/)

![Rosedale multi-sport pickleball and basketball court](/images/misc/rosedale-private-club-multi-sport-court-with-yello.webp)

Rosedale $3,800

## Rosedale club pickleball and basketball court

Challenge

A club driveway court that needed to host both pickleball and basketball without confusing lines.

What we did

Regulation pickleball layout with kitchen lines, basketball key and arc, separated by contrasting yellow and blue colours and a crisp-edge bleed barrier.

Result

Regulation-perfect court booked by members the same weekend.

-   Material: 100% acrylic line paint, regulation colours
-   Timeline: One day

Pickleball Courts

[/pickleball-court-painting-toronto/ →](/pickleball-court-painting-toronto/)

 

Toronto Central

[/service-areas/toronto-central/ →](/service-areas/toronto-central/)

![Liberty Village condo garage after restripe and renumbering](/images/misc/liberty-village-condo-underground-garage-with-fres.webp)

Liberty Village $7,400

## Liberty Village condo garage renumbering

Challenge

Ghost lines on every level after two salty winters and stall numbers that no longer matched the registry.

What we did

Phased level-by-level restripe with resident notices at every elevator and full renumbering checked against the stall registry.

Result

Residents moved cars on schedule and numbering now matches the registry.

-   Material: Low-VOC traffic coating, stall number stencils
-   Timeline: Two nights, one level at a time

Strata & Condo Painting

[/strata-condo-line-painting-toronto/ →](/strata-condo-line-painting-toronto/)

 

Toronto Central

[/service-areas/toronto-central/ →](/service-areas/toronto-central/)

![Leaside plaza thermoplastic fire route marking](/images/misc/leaside-retail-plaza-fire-route-with-bright-red-th.webp)

Leaside $2,600

## Leaside plaza thermoplastic fire route

Challenge

A fire route flagged twice by fire prevention because the paint faded every spring.

What we did

Same-day per-foot quote, COI the next morning, then thermoplastic curbs and FIRE ROUTE lettering laid in one night.

Result

Re-inspection was a formality and the route no longer needs repainting every spring.

-   Material: Hot-applied thermoplastic
-   Timeline: One night

Fire Route Marking

[/fire-route-marking-toronto/ →](/fire-route-marking-toronto/)

 

Toronto Central

[/service-areas/toronto-central/ →](/service-areas/toronto-central/)

![Forest Hill condo garage EV charging markings](/images/misc/forest-hill-condo-garage-with-a-row-of-green-fille.webp)

Forest Hill $9,800

## Forest Hill condo EV charging markings

Challenge

Fourteen new chargers across two garage levels, with gas cars parking in the charger bays.

What we did

Walked the garage with the electrician, then green fills, EV stencils, arrows, an accessible EV space and mounted signs.

Result

Gas cars stopped using EV bays almost immediately and compliance documents arrived with the invoice.

-   Material: Safety green coating with non-skid additive, EV stencils
-   Timeline: One weekend

EV Charging Markings

[/ev-charging-station-markings-toronto/ →](/ev-charging-station-markings-toronto/)

 

Toronto Central

[/service-areas/toronto-central/ →](/service-areas/toronto-central/)

![Meadowvale distribution centre loading dock markings](/images/misc/meadowvale-distribution-centre-truck-apron-with-ye.webp)

Meadowvale $12,800

## Meadowvale distribution centre loading docks

Challenge

Trailer guide lines scrubbed away each winter and drivers unsure which door was which.

What we did

Thermoplastic trailer guide lines, large dock number stencils, hazard striping at dock edges and staging boxes inside each door.

Result

Guide lines survived a full winter untouched and door mix-ups stopped.

-   Material: Thermoplastic guide lines, painted dock numbers
-   Timeline: Three weekends

Loading Dock Marking

[/loading-dock-marking-toronto/ →](/loading-dock-marking-toronto/)

 

Mississauga

[/service-areas/mississauga/ →](/service-areas/mississauga/)

![Concord industrial yard thermoplastic forklift lanes](/images/misc/concord-industrial-yard-with-thick-yellow-thermopl.webp)

Concord $13,900

## Concord industrial yard forklift lanes

Challenge

Truck and forklift traffic wiping out painted yard lanes by March every year.

What we did

Thermoplastic forklift lanes, turning zones and pedestrian crossings across the yard, phased around shipping peaks.

Result

Lanes intact through winter for the first time.

-   Material: Hot-applied thermoplastic
-   Timeline: Phased over four nights

Forklift Lane Marking

[/forklift-lane-safety-marking-toronto/ →](/forklift-lane-safety-marking-toronto/)

 

Vaughan

[/service-areas/vaughan/ →](/service-areas/vaughan/)

![Yonge and Sheppard plaza AODA accessible stall upgrade](/images/misc/yonge-and-sheppard-plaza-with-freshly-painted-aoda.webp)

Yonge and Sheppard $1,320

## Yonge and Sheppard plaza AODA stall upgrade

Challenge

Accessible stalls that were too narrow, missing access aisles and missing signs.

What we did

Four stalls rebuilt to Type A and Type B dimensions with hatched 1500mm aisles, fresh symbols and new signs.

Result

Compliance documents delivered for the landlord and insurer the same week.

-   Material: Waterborne paint, ISA stencils, mounted signs
-   Timeline: Half a day

Accessible Parking (AODA)

[/handicap-parking-painting-toronto/ →](/handicap-parking-painting-toronto/)

 

North York

[/service-areas/north-york/ →](/service-areas/north-york/)

![Line painting crew restriping a Toronto plaza parking lot overnight with Graco LineLazer rigs](/images/misc/line-painting-crew-in-yellow-work-shirts-restripin-2.webp)

24/7 Phone Answered

## Want Results Like These?

Send the site address, stall count or linear feet and your work window. A written price comes back within one business day, and your COI follows the next morning.

Request a Free Written Quote

[/contact/ →](/contact/)

 

Call (647) 577-6511

[tel:+16475776511 →](tel:+16475776511)

-   Written quote before any work
-   $2M liability + WSIB
-   Overnight 10pm-6am crews
