Yorkville shopping plaza overnight restripe
Every stall crisp by 7am opening and zero tenant complaints.
View service
Toronto commercial line painting with Graco LineLazer rigs and hot-applied thermoplastic, overnight restripes, a written per-stall quote and your COI in 24 hours.
Standard traffic paint, hot-applied thermoplastic, preformed tape, specialty markings for Property Managers | Strata and Condo Boards | Plaza Owners | Warehouse Operators | Sports Clubs and Schools across Toronto and the GTA.
Transparent Costs
Standard parking stall $12-$18. Double stall $20-$30. Fire route per linear foot $4-$8. Thermoplastic $8-$18 per linear foot. Written per-stall or per-linear-foot quote.
Graco LineLazer Rigs
3900 and 5900 airless units for standard waterborne traffic paint. Hot-applied thermoplastic for high-wear zones. Preformed cold-applied tape for intersections.
Services
Parking lot restripe, warehouse floor marking, forklift lanes, fire routes, EV charging markings, pickleball/tennis/basketball courts, custom stencils, curb painting.
24/7 Phone Answered
Line manned around the clock. Overnight restripe scheduling (10pm-6am) for retail/restaurant/plaza clients who cannot close.
Commercial COI in 24 Hours
$2M liability, WSIB, COI delivered within one business day.
20+ Years Combined
OTM Book 11 compliant, AODA accessible, TAC-standard pavement marking, thermoplastic application certified.
Written per-stall or per-linear-foot quote before any work. Thermoplastic for 3x the life of standard paint. 24/7 phone answered. Fully insured, WSIB compliant, COI in 24 hours.
"They restriped our Yorkville plaza overnight, we never closed, every stall was crisp by 7am open."
Commercial Line Painting + Pavement Marking. Standard, Thermoplastic, and Preformed Tape. One Call, Three Material Options.
Thanks, we got your request.
Expect your written quote within one business day. Need it faster? Call (647) 577-6511, answered 24/7.
Instant Written Estimate
Transparent written per-stall pricing, delivered within one business day. Overnight restripes available.
Commercial facilities cannot afford closed parking lots or peeling paint. We match rigs, materials and schedules to the way your property actually runs.
Three forces fade Toronto parking lines faster than most Canadian markets: road salt, freeze-thaw cycles and heavy traffic volume.
Toronto applies among the heaviest per-capita salt loads in North America. Salt-laden slush drags across stall lines all winter, abrading paint film and bleaching pigments. Lines crisp in October look ghost-faded by spring.
Toronto averages 70-90 transitions per winter. Water gets into the micro-pores of waterborne traffic paint, freezes and lifts the film. Spring reveals cracked, chipped, peeling lines. Standard paint lasts 12-24 months. Hot-applied thermoplastic lasts 3-5 years.
Shopping plazas, downtown lots and warehouse yards see thousands of vehicle passes per month. High-use zones like fire routes, loading docks and plaza entrances need thermoplastic or preformed tape, not standard paint.
We solve all three with the right material per application. Waterborne traffic paint for low-traffic stalls. Hot-applied thermoplastic for warehouses, fire routes and heavy-use commercial zones. Preformed cold-applied tape for intersections and crosswalks. Glass bead reflective media on every exterior line. Written per-stall quote before any work.
| Material | Typical life | Cure / reopen | Best application | Price range |
|---|---|---|---|---|
| Waterborne traffic paint | 12-24 months | 30-60 min fast-dry | Standard stalls, low to medium traffic lots, garages | $12-$18 per stall |
| Hot-applied thermoplastic | 3-5 years | Minutes | Fire routes, forklift lanes, plaza entrances, stop bars | $8-$18 per linear ft |
| Preformed cold-applied tape | 5-7 years | Open on install | Crosswalks, intersections, very high volume zones | $12-$25 per linear ft |
From a 30-stall office lot to a 10,000 sq ft thermoplastic warehouse layout. Every service is quoted per stall or per linear foot in writing.
$25,000-$75,000 Scheduled restripe programs and multi-site contracts for property management firms, retail, industrial and strata portfolios.
per year (10-site annual contract)
View service
$12-$18 Full parking lot restripes for plazas, offices and condos with waterborne paint, thermoplastic or preformed tape.
per standard stall
View service
$3-$7 Floor safety marking for warehouses and distribution centres: forklift lanes, walkways, hazard zones and staging lanes.
per linear foot
View service
$800-$1,500 Complete EV space packages: green fill or outline, EV stencil, arrows and accessibility signage.
per station
View service
$4-$8 Municipally required fire route curb and pavement markings, in paint or long-life thermoplastic.
per linear foot
View service
$8-$18 Premium hot-applied thermoplastic for fire routes, warehouses, crosswalks and heavy-traffic commercial zones.
per linear foot
View service
$3,500-$5,000 Regulation pickleball layouts for clubs, schools and private estates, standalone or overlaid on tennis courts.
per full regulation court
View service
$150-$300 AODA-compliant accessible stalls with hatched access aisles, ISA stencils, signage mounting and compliance documents.
per accessible stall
View servicePublished price ranges, then a written per-stall or per-linear-foot quote for your site. The quote is the invoice.
| Item | Price range |
|---|---|
| Standard stall | $12-$18 |
| Double stall (van accessible) | $20-$30 |
| Handicap (AODA) stall | $150-$300 |
| Fire route | $4-$8/ft |
| Thermoplastic | $8-$18/ft |
| Warehouse marking | $3-$7/ft |
| EV station (single) | $800-$1,500 |
| Pickleball court | $3,500-$5,000 |
Twenty-plus years of commercial pavement marking, numbers on paper and crews that show up when your lot is empty.
Graco LineLazer 3900/5900 airless paint, hot-applied thermoplastic and preformed tape from one crew. Few GTA contractors run both, so you get the right material per zone instead of whatever the crew owns.
Overnight 10pm-6am crews for plazas, restaurants and retail, backed by a 24/7 manned phone line. A 100-stall plaza is cured before your first tenant opens.
OTM Book 11 and TAC pavement markings, AODA accessible parking and OSHA warehouse layouts, with compliance documents on every job for inspectors, insurers and boards.
Every stall, linear foot and stencil is counted and priced before work starts. The price on the quote is the price on the invoice, no extras added mid-job.
Full EV charging packages for condo retrofits ahead of the 2035 mandate, and regulation pickleball, tennis and basketball courts for clubs, schools and estates.
$2M commercial liability and WSIB clearance. Property managers and condo boards get the certificate fast, with their company named as additional insured on request.
No surprises between the quote and the invoice.
Phone answered 24/7 or use the quote form. Tell us the address, stall count or linear feet if you know it, and your work window.
We count stalls, arrows, stencils and fire route footage, confirm the material per zone and send a written per-stall or per-linear-foot quote.
Your COI arrives within one business day. We book overnight, weekend or daytime windows and send tenant or resident notices.
Crews lay crisp lines with glass beads. Fast-dry paint cures in 30-60 minutes and thermoplastic in minutes, so you reopen on time.
We walk the site, measure every stall and linear foot, and put both options on one written quote.
Neighbourhood-level case studies. Real budgets, real timelines.
Every stall crisp by 7am opening and zero tenant complaints.
View service
Two levels finished over a weekend and ramp foot traffic stopped.
View service
Still sharp three years later, and the WSIB inspection passed on the first visit.
View serviceProperty manager, Yorkville
"They restriped our Yorkville plaza overnight, we never closed, every stall was crisp by 7am open. Zero complaints from tenants. First time in five years we did not lose a Saturday to restriping."
Industrial operator, Scarborough
"We needed thermoplastic for the forklift lanes in our Scarborough warehouse. Three years later still sharp, no fade. WSIB inspection passed on first visit."
Club owner, Rosedale
"Pickleball court layout on our Rosedale club driveway was regulation-perfect, members booked it the same weekend. The yellow and blue regulation colours look sharp."
Condo board president, Liberty Village
"Our 210-stall underground garage had ghost lines on every level after two salty winters. The crew did it over two nights, one level at a time, with notices taped to every elevator. Residents moved cars on schedule and the new numbering finally matches our stall registry."
Restaurant owner, King West
"We close at 11pm. They started at 11:30, restriped the lot and the drive-thru arrows, and we opened for breakfast with zero wet paint. Quote matched the invoice exactly."
Property manager, Leaside
"Fire Prevention flagged our faded fire route twice. Line Painting Toronto quoted per linear foot the same day, sent the COI the next morning and laid thermoplastic curbs and FIRE ROUTE lettering in one night. The re-inspection was a formality, and the thermoplastic means we are not repainting every spring anymore."
Dedicated crews in 10 cities, weekly industrial runs to Concord, Meadowvale and Bramalea, and coverage across 15 surrounding towns.
Don't see your Ontario city?
We service across the GTA. Call (647) 577-6511 or request a quote, we confirm coverage within one business day.
Straight answers on cost, materials, scheduling and compliance.
Standard parking stall $12-$18 per stall. Double stall (van accessible) $20-$30. Fire route per linear foot $4-$8. Hot-applied thermoplastic $8-$18 per linear foot. Pickleball court $3,500-$5,000 full regulation layout. Warehouse floor marking per linear foot $3-$7. Written per-stall or per-linear-foot quote before any work.
Standard waterborne traffic paint is the industry workhorse: fast-dry, affordable, lasts 12-24 months. Hot-applied thermoplastic is melted and sprayed at 400F onto the asphalt, chemically bonds, lasts 3-5 years, ideal for warehouses and fire routes. Preformed cold-applied tape is factory-manufactured strips with pressure-sensitive adhesive, lasts 5-7 years, best for intersections and heavy-traffic crosswalks.
Standard paint 18-24 months. High-traffic plazas/downtown 12 months. Thermoplastic warehouses/fire routes 3-5 years. Pickleball/sports courts 2-3 years. Annual compliance walkthroughs for strata and property manager clients.
Yes. Overnight scheduling 10pm-6am is standard for retail/restaurant/plaza. Fast-dry paint cures 30-60 minutes. Thermoplastic cures in minutes. Zero disruption to operations.
Yes. Annual compliance walkthroughs, scheduled restripe cycles, overnight work. Commercial COI in 24 hours. Thermoplastic or preformed tape premium options for heavy-wear zones. Separate commercial estimator for property manager/strata/tenant workflows.
Yes, your COI is delivered within one business day. We carry $2M commercial liability and are WSIB compliant, and we can name your property management company or condo corporation as additional insured.
Send the site address, stall count or linear feet and your work window. A written price comes back within one business day, and your COI follows the next morning.