Skip to main content
THERMOPLASTICAFTER-HOURS24/7 CALL

Toronto Line Painting Projects

Ten recent jobs across the GTA, from a Yorkville plaza restriped overnight to thermoplastic forklift lanes in Scarborough and a regulation pickleball court in Rosedale. Each card shows the budget, material and timeline, and links to the matching service and city page. Locations are given by neighbourhood or intersection only.

  • 20+ Years Combined
  • $2M Liability + WSIB
  • Graco LineLazer + Thermoplastic
  • OTM Book 11 Compliant
  • COI in 24 Hours
Yorkville shopping plaza after an overnight line painting restripe
Yorkville $4,200

Yorkville shopping plaza overnight restripe

Challenge
A busy multi-tenant plaza that had lost a Saturday to restriping every year for five years.
What we did
Full restripe overnight with Graco LineLazer 3900 rigs, fire route curbs, accessible stalls and reserved stencils, phased so early-opening tenants were done first.
Result
Every stall crisp by 7am opening and zero tenant complaints.
  • Material: Fast-dry waterborne paint, glass beads
  • Timeline: One overnight shift, 10pm-6am
Yonge and Eglinton underground garage after restriping
Yonge and Eglinton $6,850

Yonge and Eglinton underground garage

Challenge
200 stalls across two underground levels with faded stalls, unmarked columns and people walking down the ramp.
What we did
Moisture testing and primer on damp sections, restriped stalls, yellow and black column chevrons, clearance markings and a pedestrian path to the elevator lobby.
Result
Two levels finished over a weekend and ramp foot traffic stopped.
  • Material: Low-VOC traffic coating, moisture-tolerant primer
  • Timeline: Two days over one weekend
Scarborough warehouse with thermoplastic forklift lanes and walkways
Scarborough $18,500

Scarborough warehouse thermoplastic forklift lanes

Challenge
Painted forklift lanes ground away at every intersection, with a WSIB inspection coming up.
What we did
Thermoplastic forklift lanes and pedestrian walkways laid out to the fleet, with stop bars and crossings at every aisle intersection.
Result
Still sharp three years later, and the WSIB inspection passed on the first visit.
  • Material: Hot-applied thermoplastic
  • Timeline: Phased over several nights
Rosedale multi-sport pickleball and basketball court
Rosedale $3,800

Rosedale club pickleball and basketball court

Challenge
A club driveway court that needed to host both pickleball and basketball without confusing lines.
What we did
Regulation pickleball layout with kitchen lines, basketball key and arc, separated by contrasting yellow and blue colours and a crisp-edge bleed barrier.
Result
Regulation-perfect court booked by members the same weekend.
  • Material: 100% acrylic line paint, regulation colours
  • Timeline: One day
Liberty Village condo garage after restripe and renumbering
Liberty Village $7,400

Liberty Village condo garage renumbering

Challenge
Ghost lines on every level after two salty winters and stall numbers that no longer matched the registry.
What we did
Phased level-by-level restripe with resident notices at every elevator and full renumbering checked against the stall registry.
Result
Residents moved cars on schedule and numbering now matches the registry.
  • Material: Low-VOC traffic coating, stall number stencils
  • Timeline: Two nights, one level at a time
Leaside plaza thermoplastic fire route marking
Leaside $2,600

Leaside plaza thermoplastic fire route

Challenge
A fire route flagged twice by fire prevention because the paint faded every spring.
What we did
Same-day per-foot quote, COI the next morning, then thermoplastic curbs and FIRE ROUTE lettering laid in one night.
Result
Re-inspection was a formality and the route no longer needs repainting every spring.
  • Material: Hot-applied thermoplastic
  • Timeline: One night
Forest Hill condo garage EV charging markings
Forest Hill $9,800

Forest Hill condo EV charging markings

Challenge
Fourteen new chargers across two garage levels, with gas cars parking in the charger bays.
What we did
Walked the garage with the electrician, then green fills, EV stencils, arrows, an accessible EV space and mounted signs.
Result
Gas cars stopped using EV bays almost immediately and compliance documents arrived with the invoice.
  • Material: Safety green coating with non-skid additive, EV stencils
  • Timeline: One weekend
Meadowvale distribution centre loading dock markings
Meadowvale $12,800

Meadowvale distribution centre loading docks

Challenge
Trailer guide lines scrubbed away each winter and drivers unsure which door was which.
What we did
Thermoplastic trailer guide lines, large dock number stencils, hazard striping at dock edges and staging boxes inside each door.
Result
Guide lines survived a full winter untouched and door mix-ups stopped.
  • Material: Thermoplastic guide lines, painted dock numbers
  • Timeline: Three weekends
Concord industrial yard thermoplastic forklift lanes
Concord $13,900

Concord industrial yard forklift lanes

Challenge
Truck and forklift traffic wiping out painted yard lanes by March every year.
What we did
Thermoplastic forklift lanes, turning zones and pedestrian crossings across the yard, phased around shipping peaks.
Result
Lanes intact through winter for the first time.
  • Material: Hot-applied thermoplastic
  • Timeline: Phased over four nights
Yonge and Sheppard plaza AODA accessible stall upgrade
Yonge and Sheppard $1,320

Yonge and Sheppard plaza AODA stall upgrade

Challenge
Accessible stalls that were too narrow, missing access aisles and missing signs.
What we did
Four stalls rebuilt to Type A and Type B dimensions with hatched 1500mm aisles, fresh symbols and new signs.
Result
Compliance documents delivered for the landlord and insurer the same week.
  • Material: Waterborne paint, ISA stencils, mounted signs
  • Timeline: Half a day
Line painting crew restriping a Toronto plaza parking lot overnight with Graco LineLazer rigs
24/7 Phone Answered

Want Results Like These?

Send the site address, stall count or linear feet and your work window. A written price comes back within one business day, and your COI follows the next morning.

  • Written quote before any work
  • $2M liability + WSIB
  • Overnight 10pm-6am crews
Call 24/7Free Quote