Skip to main content
THERMOPLASTICAFTER-HOURS24/7 CALL

Line Painting Prices in Toronto

Published price ranges for every common job. Your site gets a written per-stall or per-linear-foot quote before any work starts, and the price on the quote is the price on the invoice.

  • 20+ Years Combined
  • $2M Liability + WSIB
  • Graco LineLazer + Thermoplastic
  • OTM Book 11 Compliant
  • COI in 24 Hours
Price List

Toronto Line Painting Price Ranges

Line painting price ranges in Toronto
ItemPrice range
Standard stall $12-$18
Double stall (van accessible) $20-$30
Handicap (AODA) stall $150-$300
Fire route $4-$8/ft
Thermoplastic $8-$18/ft
Preformed tape $12-$25/ft
Warehouse marking $3-$7/ft
Forklift lanes (thermoplastic) $8-$15/ft
Curb painting $2-$5/ft
EV station (single) $800-$1,500
Multi-station condo EV $5K-$30K
Pickleball court $3,500-$5,000
Basketball court $2,500-$6,000
Tennis court $3,000-$7,500
Shopping plaza (100 stalls) $1,500-$3,000
Underground garage (200 stalls) $4K-$9K
Annual property manager contract (10 sites) $25K-$75K/yr

Quoted per job in writing: Custom Pavement Logos, Playground Markings, Stencil Painting.

Timelines

How Long Does It Take?

Typical line painting timelines
JobTypical time
30-stall lot 2-4 hrs
100-stall plaza 1 day
200-stall garage 2 days
Warehouse 10K sq ft thermoplastic 2-3 days
Pickleball court 4-6 hrs

Pricing Notes

  • Written per-stall or per-linear-foot quote before any work.
  • Layout changes, surface prep, arrows, stencils and access affect the final quote, and each is itemized.
  • Overnight 10pm-6am and weekend windows at no surprise surcharge; any scheduling premium is on the quote.
  • Prices in Canadian dollars, plus HST.
  • COI with $2M liability and WSIB within one business day.
Cost Per Year, Not Per Coat

Paint vs Thermoplastic vs Preformed Tape

Thermoplastic costs more per foot but lasts about three times longer than paint in high-wear zones. Here is how the three compare.

Line marking materials compared: life, best use and Toronto price range
Material Typical life Cure / reopen Best application Price range
Waterborne traffic paint 12-24 months 30-60 min fast-dry Standard stalls, low to medium traffic lots, garages $12-$18 per stall
Hot-applied thermoplastic 3-5 years Minutes Fire routes, forklift lanes, plaza entrances, stop bars $8-$18 per linear ft
Preformed cold-applied tape 5-7 years Open on install Crosswalks, intersections, very high volume zones $12-$25 per linear ft

Example: 1,000 linear feet of high-wear fire route at $6/ft in paint, repainted every 12 months, is about $30,000 over five years. The same route in thermoplastic at $13/ft, applied twice in five years, is about $26,000 with three fewer closures. On quieter zones where paint lasts 24 months, paint usually stays the cheaper choice, and we will tell you so. See thermoplastic details.

Pricing Questions

Line Painting Cost FAQs

How much does line painting cost in Toronto?

Standard parking stall $12-$18 per stall. Double stall (van accessible) $20-$30. Fire route per linear foot $4-$8. Hot-applied thermoplastic $8-$18 per linear foot. Pickleball court $3,500-$5,000 full regulation layout. Warehouse floor marking per linear foot $3-$7. Written per-stall or per-linear-foot quote before any work.

What do EV charging station markings include?

A full EV package includes the stall outline or green fill, the EV plug-and-car stencil, directional arrows and accessibility signage. Single stations cost $800-$1,500 and multi-station condo projects $5K-$30K.

How much does warehouse floor marking cost?

Warehouse floor marking costs $3-$7 per linear foot in paint and $8-$15 per linear foot for thermoplastic forklift lanes. We phase the work zone by zone around your shifts so the floor never fully shuts down.

How much does fire route marking cost and how long does it last?

Fire route marking costs $4-$8 per linear foot in paint, which lasts 12-24 months, or $8-$18 per linear foot in thermoplastic, which lasts 3-5 years. Both include curb coating and FIRE ROUTE stencils.

How do your written quotes work?

We measure stall counts and linear feet, confirm the material per zone and the work window, then send a written per-stall or per-linear-foot quote before any work starts. The price on the quote is the price on the invoice.

Line painting crew restriping a Toronto plaza parking lot overnight with Graco LineLazer rigs
24/7 Phone Answered

Get Your Written Per-Stall Quote

Send the site address, stall count or linear feet and your work window. A written price comes back within one business day, and your COI follows the next morning.

  • Written quote before any work
  • $2M liability + WSIB
  • Overnight 10pm-6am crews
Call 24/7Free Quote