Line Painting Prices in Toronto
Published price ranges for every common job. Your site gets a written per-stall or per-linear-foot quote before any work starts, and the price on the quote is the price on the invoice.
Toronto Line Painting Price Ranges
| Item | Price range | Service |
|---|---|---|
| Standard stall | $12-$18 | Details |
| Double stall (van accessible) | $20-$30 | Details |
| Handicap (AODA) stall | $150-$300 | Details |
| Fire route | $4-$8/ft | Details |
| Thermoplastic | $8-$18/ft | Details |
| Preformed tape | $12-$25/ft | Details |
| Warehouse marking | $3-$7/ft | Details |
| Forklift lanes (thermoplastic) | $8-$15/ft | Details |
| Curb painting | $2-$5/ft | Details |
| EV station (single) | $800-$1,500 | Details |
| Multi-station condo EV | $5K-$30K | Details |
| Pickleball court | $3,500-$5,000 | Details |
| Basketball court | $2,500-$6,000 | Details |
| Tennis court | $3,000-$7,500 | Details |
| Shopping plaza (100 stalls) | $1,500-$3,000 | Details |
| Underground garage (200 stalls) | $4K-$9K | Details |
| Annual property manager contract (10 sites) | $25K-$75K/yr | Details |
Quoted per job in writing: Custom Pavement Logos, Playground Markings, Stencil Painting.
How Long Does It Take?
| Job | Typical time |
|---|---|
| 30-stall lot | 2-4 hrs |
| 100-stall plaza | 1 day |
| 200-stall garage | 2 days |
| Warehouse 10K sq ft thermoplastic | 2-3 days |
| Pickleball court | 4-6 hrs |
Pricing Notes
- Written per-stall or per-linear-foot quote before any work.
- Layout changes, surface prep, arrows, stencils and access affect the final quote, and each is itemized.
- Overnight 10pm-6am and weekend windows at no surprise surcharge; any scheduling premium is on the quote.
- Prices in Canadian dollars, plus HST.
- COI with $2M liability and WSIB within one business day.
Paint vs Thermoplastic vs Preformed Tape
Thermoplastic costs more per foot but lasts about three times longer than paint in high-wear zones. Here is how the three compare.
| Material | Typical life | Cure / reopen | Best application | Price range |
|---|---|---|---|---|
| Waterborne traffic paint | 12-24 months | 30-60 min fast-dry | Standard stalls, low to medium traffic lots, garages | $12-$18 per stall |
| Hot-applied thermoplastic | 3-5 years | Minutes | Fire routes, forklift lanes, plaza entrances, stop bars | $8-$18 per linear ft |
| Preformed cold-applied tape | 5-7 years | Open on install | Crosswalks, intersections, very high volume zones | $12-$25 per linear ft |
Example: 1,000 linear feet of high-wear fire route at $6/ft in paint, repainted every 12 months, is about $30,000 over five years. The same route in thermoplastic at $13/ft, applied twice in five years, is about $26,000 with three fewer closures. On quieter zones where paint lasts 24 months, paint usually stays the cheaper choice, and we will tell you so. See thermoplastic details.
Line Painting Cost FAQs
How much does line painting cost in Toronto?
Standard parking stall $12-$18 per stall. Double stall (van accessible) $20-$30. Fire route per linear foot $4-$8. Hot-applied thermoplastic $8-$18 per linear foot. Pickleball court $3,500-$5,000 full regulation layout. Warehouse floor marking per linear foot $3-$7. Written per-stall or per-linear-foot quote before any work.
What do EV charging station markings include?
A full EV package includes the stall outline or green fill, the EV plug-and-car stencil, directional arrows and accessibility signage. Single stations cost $800-$1,500 and multi-station condo projects $5K-$30K.
How much does warehouse floor marking cost?
Warehouse floor marking costs $3-$7 per linear foot in paint and $8-$15 per linear foot for thermoplastic forklift lanes. We phase the work zone by zone around your shifts so the floor never fully shuts down.
How much does fire route marking cost and how long does it last?
Fire route marking costs $4-$8 per linear foot in paint, which lasts 12-24 months, or $8-$18 per linear foot in thermoplastic, which lasts 3-5 years. Both include curb coating and FIRE ROUTE stencils.
How do your written quotes work?
We measure stall counts and linear feet, confirm the material per zone and the work window, then send a written per-stall or per-linear-foot quote before any work starts. The price on the quote is the price on the invoice.
Get Your Written Per-Stall Quote
Send the site address, stall count or linear feet and your work window. A written price comes back within one business day, and your COI follows the next morning.
- Written quote before any work
- $2M liability + WSIB
- Overnight 10pm-6am crews